caferemote
Worldwide Mission Critical

Data Center Construction Electrical Design Engineer

Remote United States Full-time Posted 1h ago
Apply now
Work from
United States
Contract
Full-time
Posted
17 November 2026
Apply by
16 January 2027

As an Electrical Design Engineer, you will play a critical role in guiding the planning, coordination, and execution of advanced electrical systems on large-scale infrastructure projects. You will work cross-functionally with internal teams and external partners to ensure that all designs are technically robust, code-compliant, and aligned with project objectives.

About the role

Your focus will be on delivering reliable, efficient, and scalable electrical solutions while upholding safety, quality, cost, and schedule commitments.

Responsibilities

You will serve as a key liaison between internal departments, external consultants, contractors, and the Engineer of Record (EoR) to troubleshoot and resolve electrical design challenges.

You will lead the development and review of electrical documents, including one-line diagrams, load calculations, panel schedules, submittals, technical studies, and RFIs.

You will research and develop emerging trends and new technologies to optimize electrical systems and infrastructure in data centers, enhancing efficiency, reliability, and scalability.

You will be responsible for ensuring the timely delivery of design packages by identifying bottlenecks, introducing efficiencies, and proactively managing evolving project requirements.

You will ensure electrical systems meet all applicable codes and standards (NEC, IEEE, IEC) while maintaining design quality and mitigating technical risk.

You will contribute to budget management by evaluating the cost impact of design changes, tracking electrical expenditures, and analyzing contractual obligations tied to the EoR.

You will participate in risk assessment and commissioning efforts, including factory and site acceptance testing, milestone inspections, and integration verification.

You will coordinate closely with mechanical, controls, and architectural teams to ensure the electrical systems are fully integrated into the broader design framework.

You will mentor and support junior engineers, reinforcing consistent design practices and ensuring knowledge continuity across the team.

You will help capture lessons learned and apply them to improve future design processes, standards, and project outcomes.

You will support construction activities in the field, resolving installation issues, conducting walkthroughs, and ensuring a successful handoff to operations.

About Worldwide Mission Critical

Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies deliver their data centers on time and under budget. Founded on the principle that the right team of experienced data center professionals will deliver great projects, our ability to provide oversight for all aspects of a project sets us apart.

Skills, Knowledge, Education, and Experience

Bachelor’s degree in Electrical Engineering or Power Engineering with electrical building systems emphasis.

Revit BIM design experience required.

Proficiency in power distribution and lighting design, including controls implementation.

Experience with short circuit analysis and utilization of analytical modeling software such as SKM or similar tools.

Strong background in the design, construction, and commissioning of medium and low voltage electrical distribution systems, and power management or SCADA tools.

Preferred qualifications include a Professional Engineering (PE) license.

Experience in mission-critical facilities and their electrical/mechanical infrastructure.

Knowledge and experience in estimating, electrical design, operation, and commissioning of substations, switchgear, and power monitoring.

Minimum 5 years' experience in A/E industry preferred.

Comprehensive understanding of professional services from conceptual design through project close-out.

Strong written and verbal communication skills, organizational skills, and ability to motivate and mentor staff.

Familiarity with sustainable design approaches and related project impacts.

Passion for improving workflows and mentoring team members.

Proficient with Microsoft Productivity Suite products.

If you're ready to bring your expertise to a team that's redefining how data centers get built, we'd love to hear from you. At Worldwide Mission Critical, you'll find the support, trust, and room to grow that helped us become one of the fastest-growing companies in the country — and we're just getting started.

Discussion

No comments yet. Ask a question or share a tip about this role.

Apply now

More jobs from Worldwide Mission Critical

View company →

Data Center Construction Electrical Estimator

Worldwide Mission Critical
Remote United States Full-time

ABOUT WORLDWIDE MISSION CRITICAL Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the…

3h ago Data

Data Center Development Manager

Worldwide Mission Critical
Remote United States Full-time

Worldwide Mission Critical is a global owner’s representation and project management company dedicated to the mission-critical industry, helping companies…

6h ago Data

Similar remote jobs

Browse all →

AI Voice Recording Contributor - Simplified Chinese

RWS Group
Remote United Kingdom Contract $20 / hour

We are looking for AI Voice Recording Contributors to join a Simplified Chinese voice evaluation project and help support the development of the next generation of AI technologies. Job…

1h ago Data

eCOA Coordinator

Alimentiv
Remote United States Full-time

Alimentiv is a global CRO with a singular focus: advancing therapies for patients with gastrointestinal diseases. GI is our WHY and for more than 30 years that purpose has driven our…

1h ago Data

AI Operations Associate (India, Remote)

Recruitingbond
Remote India Contract INR 600K – INR 1000K / year

About this role: AI Operations Associate, India (₹600,000 - ₹1,000,000/year) Human quality checks on My Client's AI during US business hours. Most of the job is reviewing AI-written…

2h ago Data

Data and Analytics Engineer

Nimble Gravity
Remote Anguilla, Antigua and Barbuda, Argentina, Aruba, Bahamas, Barbados, Belize, Bermuda, Bolivia, Bonaire, Sint Eustatius and Saba, Brazil, Cayman Islands, Chile, Colombia, Costa Rica, Cuba, Dominica, Dominican Republic, Ecuador, El Salvador, Falkland Is Full-time

Analytics Engineer & AI Specialist About the Role As Analytics Engineers you would combine insurance domain expertise with full-stack data and analytics engineering capabilities. You will…

2h ago Data

Senior Associate, GBS - Client Consulting and Analytics (Remote, any state, US)

New York Life Insurance Co
Remote United States Full-time $90K – $120K / year

Location Designation: Fully Remote Group Benefit Solutions deliverscomprehensive insurance and absence management solutions for mid-sized and large companies. Our work fosters a healthier,…

2h ago Data

Data Analyst

Cayuse Holdings
Remote United States Full-time

Overview The Data Engineer/Analyst collaborates with clients, data scientists, and software engineers to develop and optimize data pipelines, ETL processes, and database structures that…

2h ago Data

Get remote jobs the moment they are posted

Choose your categories and skills. We push matching jobs to your device. No email, ever.